Thomas & Betts 171XSH234614SP

Pre-Fab Components & Assemblies -

1 / 1
Thomas & Betts 171XSH234614SP Pre-Fab Components & Assemblies - — General Accessories
Manufacturer catalogue image

Product Description

The pre-assembly system is designed for use with armored and metal clad cables, incorporating a box to stud bracket along with a 4-inch pre-galvanized steel square box. It is equipped with a C-3 armored cable clamp and a 3/4 inch raised one device cover, as well as a pre-installed stranded pigtail. The assembly features multiple knockouts, including two 1/2 inch and one 3/4 inch knockout on each side for conduit, two knockouts on each end for cable, and one 1/2 inch knockout at the bottom for additional conduit options. Constructed from steel, this component meets functional requirements for various installation contexts.

  • Get up to 90 days payment terms from 500+ suppliers
  • Reselling discounts up to 40%!
Sign Up
Send request for price
Send Inquiry
Payment methods:
Request a Quote and we will send you information on availability and price.

Specifications

Knockouts-Each Side (Conduit)
(2) - 1/2", (1) - 1/2" & 3/4" E
Knockouts-Each End (Cable)
2
Knockouts-Bottom (Conduit)
(1) - 1/2"
Material
Steel
Outer Package
10
T&B Sold in UOM
Each

Access our platform to find more offers

Register now to explore 36 mln offers from verified suppliers worldwide.

  • Compare offers globally
  • Direct supplier contact
  • RFQs, Quotes, and Orders
  • BOM Search
Sign UpFree 14-day trial available

Documents

Data Sheet

Datasheet for Thomas & Betts 171XSH234614SP, including specifications and features.

Download Data Sheet
TracePartsTraceParts

CAD Models

3D CAD model and technical drawings, ready for your design software.

Download CAD Model

Market insights

AutomaINSIGHTS analytics dashboard

Get real-time analytics and market data to optimize your purchasing decisions for this component and similar products

  • Real-time stock availability data from 700 MRO distributors in Europe and USA
  • Price analysis by condition (new, used, refurbished) with market median prices
  • Critical component availability monitoring to prevent production downtime
  • Inventory optimization insights based on market supply trends
Get Started

Other Categories